Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13670480

- Product Categories
- Friendly Links
Information Name: | Yancheng build drainage board, Ltd. |
Published: | 2015-03-14 |
Validity: | 365 |
Specifications: | Complete |
Quantity: | 878888.00 |
Price Description: | |
Detailed Product Description: | 186 * 6132 * 3779 [Wang] Our main products are: drainage board, grass grid, plastic drainage board, build drainage board, drainage board, guide the water board, geotextile fabric, eco bags, plastic water stop, drainage cage three-dimensional composite drainage network, waterproof geotextile, geomembrane, HDPE geomembrane, HDPE impermeable membrane, filament geotextile, plastic geogrid, fiberglass-plastic geogrid, soft water pipe (diameter 5 cm, 8 cm, 10 cm, 15 cm, 20 cm, 30 cm), Geocell, geotextile mat, infiltration and drainage sheet, geotextile mats, waterproof blanket, plastic blind ditch series of geotechnical materials, widely used in landfill landfill, tailings dam, water, chemicals, highway, railway, subway, soil and water conservation projects. Enterprises have long strong technical force, excellent product quality and perfect after-sales service and continued to win market, access to development. Its products have wide applications due to anti-aging, good durability, corrosion-resistant, non-toxic and environmentally friendly features and is widely used in hundreds of national key construction projects are welcome to consult the discussion! Day Sales Hotline: Wang [186 * 6132 * 3779] look forward to working with you! Provide test reports ISO9000 certification, please rest assured that order drainage board manufacturers I produced indicators have been through the national quality inspection, component detecting welcome customers to order Drainage Board meanings: (186-6132-3779 Wang) good The drainage system for normal use and life cycle of construction and civil engineering structures play an important role. Green Label Type Drainage Board porous tubes with an effective drainage system sparse, long and short cylindrical drain and geotextile form a drainage system, to form a water seepage, water and drainage systems. Drainage board series, plastic drainage board uses: garage roof garden, roof garden, roof garden, soccer fields, golf courses, road embankment, subway tunnels, building foundations upper or lower, basement and outside walls, roof and across impermeable thermal layer, and a lot of water in the pillar. Between each block can be mutually engaging to form a composite drainage board. Green Label drainage board drainage uniform, timely, good ventilation, good regulation; light weight, can greatly reduce the load-bearing pressure of the building; the load resistance and durability, high compressive strength; good roof insulation function ; construction convenient, short construction period, reduce construction costs; green and so on. Drain construction Note: Drain the lowest price, quality assurance, factory production, supply the details around the country Advisory: [186 = 6132 = 3779 Wang] 1, the performance difference between the drainage board, the process is different, different requirements for temperature, but usually in the 5-35 ° C temperature environment to start as well. For polymer modified bitumen membrane cold sticky type of synthetic membrane members should not be in the negative high temperature below the ground-breaking; bitumen should not groundbreaking at 0 ℃; asphalt-based paints, polymer water emulsion asphalt coating and rigidity waterproof layer should not be below 5 ℃ groundbreaking, when the temperature exceeds 35 degrees Celsius, all of waterproof materials are not groundbreaking. 2, the requirements for wind and waterproof layer shall not be more than five westerly groundbreaking. Because westerly weather will be easy to dust and sand blowing, adhere to the grassroots level, resulting in a waterproof adhesive layer and the grass roots. Drainage Board drainage board price advantage compared with conventional drainage board: 186 ... 6132-3779 when Wang drain tile can be directly applied to the roofing project above the waterproof layer, instead of the traditional waterproof layer on top of the roof of 7cm thick reinforced concrete rigid protective layer, so that the original rigid protective layer becomes flexible, making construction easier, faster, and reduce the rigidity of the construction process of the destruction of the protective layer waterproof layer completed fundamentally, from the perspective of the whole project, drainage board construction speed without conservation backfill subsequent follow-up, greatly shorten the construction period, save manpower, financial and material resources. Drainage Board; municipal engineering: road embankment, subway tunnels Construction: building the basis of the upper or lower, basement and outside walls, roof and insulation and other impervious Traffic Engineering: roads, railway embankment, dams and slope protection layer drainage board price Inquiries: 186 * 6132 * [Wang 3779] QQ: 742390035 |
Admin>>>
You are the 4221 visitor
Copyright © GuangDong ICP No. 10089450, Tai'an City Xinxin Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 4221 visitor
Copyright © GuangDong ICP No. 10089450, Tai'an City Xinxin Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility